geo

How to become a company customer?

Separation of customer/immovable property

In case of division of real estate, the new customer must pay for the full technological cycle service according to Appendix No. 3 of the Rules, and in case of division of an object with smart meters - the fee for the package offered for the installation of a smart meter specified in Appendix No. 4 (the fee provided for in Article 18, Clause 2 of the Rules in accordance with the payment procedure), if:

a) real estate connected with a power of 0 to 10 kW is separated by one real estate, and the owner of the separated real estate requests connection with a power of 0 to 10 kW;
b) When dividing the real estate of a customer connected with a power greater than 10 kW, there is an agreement between the parties on power sharing and the existing power is sufficient to supply the old and separated property with a power of at least 10 kW;

c) One or more real estates in the building are supplied with electricity (through a registered customer), there is a requirement to connect a new facility to the distribution network individually, and this facility has at least 10 kW. For power supply, it is only necessary to arrange a metering node.

In the case provided by paragraph 2 of this article, the fee for connecting a new facility to the distribution network does not apply to the restoration of the electricity supply of a facility belonging to a non-household customer, if the customer was supplied with electricity not through the system operator, but through the electric network owned by him or another person. In such a case, the restoration of electricity supply should be done in accordance with the conditions and procedures provided by Article 18, Clause 17 of the Rules.

Annex №3

Annex 3 dates and fee for arrangement of metering knot

Voltage step kV

Capacity kW

Dates for arrangement of
metering knot (working days)

Fee for arrangement of
metering
knot including VAT (GEL)

 

0,4

1-10 (220 ვ.)

10

100

1-10

10

300

From 10 to 30

10

350

From 30 to 50

10

600

From 50 to 80

10

650

From 80 to 100

15

700

From 100 to 120

15

750

From 120 to 150

15

800

From 150 to 200

15

850

From 200 to 320

15

950

From 320 to 500

15

1200

From 500 to 800

20

1500

From 800 to 1000

20

2200

From 1000 and more kW

20

3000

 

 

6/10

From 1-500

25

13000

From 500 to 1000

25

14000

From 1000 and more kW

25

15000



Annex 4

Terms and fees for smart meter installation

  Voltage step kV

kW capacity

metering system

Multifunctional electronic metering

  System setup fee including VAT, GEL

Smart meter arrangement

Price including VAT, GEL

0,4

1-10 (220 V)

15

400

400

1-10

15

600

600

From 10 to 30

15

600

600

From 30 to 50

15

700

600

From 50 to 80

15

700

600

From 80 to100

20

800

600

From 100 to 120

20

800

600

From 120 to 150

20

1000

600

From 150 to 200

20

1200

600

From 200 to 320

20

2200

2000

From 320 to 500

20

2500

2000

From 500 to 800

25

2800

2000

 From 800 to 1000

25

3100

2000

 From 1000 and more kW

25

3500

2000

6/10

From 1-500

25

13000

2000

From 500 to 1000

25

14000

2000

From 1000 and more kW

25

15000

2000

 

 

 

Bank Requisites where to pay the new connection fee: 

Recipient bank: JSC TBC BAnk 

Account Number: GE32TB7015336030100006

Description: Cost for the registration as a customer of the separated area and new connection to the network (name of the applicant and factual address of the object).

You may send the filled in form to an e-mail address: newcustomers@energo-pro.ge

Annex download here:


Regarding customer division
 GEO



About separation of a new customer from an object supplied with a common meter (including a multi-apartment residential building)" GEO