Rules and requirements for the connection of the new object (residential place, enterprise or other object) to the distribution network also are spread on electricity supply resumption of the object owned by that nonresidential customer, who is not supplied with the electricity and in last 10 years did not consume electricity on this site from distribution network and did not address System Operator for electricity supply resumption (in the same period).

Restoration procedure of the old customer registration is the following:

1. Person who wants to be connected (applicant) is obliged to make an apppeal to JSC “Energo-Pro Georgia” with the relevant application, requesting the connection to the distribution network (electronic or written form) that should be attached by  any document (old technical specifications, act for site connection and etc.) that will confirm the fact (if such exists) of electricity supply in past (no more than 10 years in case of non-residential)

2. JSC “Energo-Pro Georgia” will conduct the survey on site and in case of the applicant’s request is confirmed will draft corresponding technical specifications and hand over within 2 weeks period.

3. After fulfillment of the commitments defined by technical specifications, applicant is obliged to address JSC “Energo-Pro Georgia” with the request “Organizing the metering knot when non regulated connection” in written form that will be attached by confirming payment task or bill for the arranging the metering knot.

Annex №3

Annex 3 dates and fee for arrangement of metering knot

Voltage step kV

Capacity kW

Dates for arrangement of
metering knot (working days)

Fee for arrangement of metering
knot including VAT (GEL)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

0,4

1-10 (220 V)

10

100

1-10

10

300

from 10 to 30

10

350

from 30 to 50

10

600

from 50 to 80

10

650

from 80 to 100

15

700

from 100 to 120

15

750

from 120 to 150

15

800

from 150 to 200

15

850

from 200 to 320

15

950

from 320 to 500

15

1200

from 500 to 800

20

1500

from 800 to 1000

20

2200

from 1000 and more

20

3000

 

 

 

 

 

6/10

1-500

25

13000

from 500 to 1000

25

14000

from 1000 and more

25

15000

Bank Requisites on which should be paid the cost of new consumer’s connection to the network:
Recipient Bank: JSC “TBC Bank”
Account Number: GE32TB7015336030100006
Description: Restoration cost of old consumers registration and network connection. (Should be indicated the name of applicant and factual addres of object)

Filled in application form for registration of old consumer can be sent to the following e-mail: newcustomers@energo-pro.ge


Application form download here: