geo

Arrangement of metering knot during unregulated connection

Organization of metering knot at non regulated connection

After fullfiling of technical specification issed from the side of Company the applicant should apply in written form that will be attached by tax assignment or bill (receipt) confirming the fee for arranging of metering knot.
After written application JSC “ENERGO-PRO Georgia” will arrange the metering knot and provide connection of site (object) to the network within the frames of legislation.

Annex №3

Dates and fee for arrangement of metering knot

Voltage step kV

Capacity kW

Dates for arrangement of
metering knot (working days)

Fee for arrangement of metering
knot including VAT (GEL)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

0,4

1-10 (220 V)

10

100

1-10

10

300

from 10 to 30

10

350

from 30 to 50

10

600

from 50 to 80

10

650

from 80 to 100

15

700

from 100 to 120

15

750

from 120 to 150

15

800

from 150 to 200

15

850

from 200 to 320

15

950

from 320 to 500

15

1200

from 500 to 800

20

1500

from 800 to 1000

20

2200

from 1000 and more

20

3000

 

 

 

 

 

6/10

1-500

25

13000

from 500 to 1000

25

14000

from 1000 and more

25

15000

Bank Requisites 


Recipient Bank: JSC “TBC Bank”

Account Number:GE32TB7015336030100006


Description: Fee for arranging the metering knot during non regulated connection (should be indicated the name of applicant and factual address of object).




Arranging of metering knot during non regulated connection can be sent to the following e-mail addres: newcustomers@energo-pro.ge

Annex download here: Application Form 



List of multifunctional electric meters