How to become a company customer?

Non regulated new connection

A) New connection is non-regulated if the there is such connection on the object when the capacity requested by application is not included in the requested packages of regulated new connection, also the object according to voltage indicated in the application is away from the Company owned distribution network with more distance (where carries out electricity distribution activity):
 
  • In case of 0,4 kV voltage new consumer(6/10 kV and 0.4 kV) – in radius more than 600 m;
  • In case of 6/10 kV new customer – in radius more than 6 km;

Also, if there is request for connection of 35 kV and higher voltage new consumer or consumers (new consumer’s or consumers’ network) to the distribution network or such type connection request on what the cost of new consumer’s connection to the distribution network is not spread, organization of electricity sypply system of such object or/and construction of connection to the existed electricity distribution network shall be carried out upon agreement between the licensee and person willing to be connected (applicant), and in case of disagreement, person willing to be connected ensures needed project and construction-installing works personnely (through own or other construction enterprise). Despite of disagreement, distribution licensee is obliged to issue technical specification for free connection to the distribution network within 2 weeks period from receipt of the application. Within the activity term of issued technical specification (no less than throughout 1 year) unilateral change is forbidden. Technical specification of connection shall include the following information together with other information;

  • Connection point
  • Connection voltage level
  • Capacity to be connected (in accordance with the project)

If the person willing to be connected (personally or through other person) ensures project and construction-installation works required for the connection in accordance with the issued technical specification, person willing the connection is obliged to:

  • Totally follow the requirements foreseen by technical specification of connection;
  • Report to the distribution licensee on construction /installation works of connection in advance, not to hinder technical supervision of construction (in case of supervision by distribution licensee) and fulfill written form instructions of distribution licensee deriving from the requiremet of technical regulations.
  • Apply to distribution licensee with application requesting arrangement of the metering knot and fulfillment of network break in activities after completion of construction-installation works for connection of object, Herewith, he/she is obliged to pay 50% of the cost for organizing the metering knot before submission of application in accordance with the capacity requested by application for each consumer in accordance with requested capacity by the application and quantity of individual metering knots (Annex No 6, according to the defined offered packages). Payment of the remaining amount shall be done by new consumer within 10 days from the date when electricity supply is commenced.
B) When jointly requesting two or more new customers connection, in addition to the fees set out in Annex N4 of the New Customer Connection to the Distribution Network, the applicant shall also pay an additional fee of 100 GEL (including VAT) for each new customer. In case of connecting a 20-apartment building block, along with the connection capacity cost envisaged by the design documentation, the applicant will pay an additional GEL 2000 for the installation of the metering unit.

C) In case of two or more customers connection simultaneously, multi flat (residential customers) simultaneous load ratio grid for gasified sector.




 

Number of Customers

 

     New Ratio    

     

2

  0.78 

3

  0.67 

5

  0.56 

6

  0.53 

9

  0.47 

12

  0.43 

15

  0.40 

18

  0.39 

24

  0.37 

40

  0.33 

60

  0.3 

100

  0.28 

150

  0.27 

200

  0.26 

250

  0.26 

Annex №3

Dates and fee for arrangement of metering knot

Voltage step kV

Capacity kW

Dates for arrangement of
metering knot (working days)

Fee for arrangement of metering
knot including VAT (GEL)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

0,4

1-10 (220 V)

10

100

1-10

10

300

from 10 to 30

10

350

from 30 to 50

10

600

from 50 to 80

10

650

from 80 to 100

15

700

from 100 to 120

15

750

from 120 to 150

15

800

from 150 to 200

15

850

from 200 to 320

15

950

from 320 to 500

15

1200

from 500 to 800

20

1500

from 800 to 1000

20

2200

from 1000 and more

20

3000

 

 

 

 

 

6/10

1-500

25

13000

from 500 to 1000

25

14000

from 1000 and more

25

15000

Bank Requisites on which should be paid the cost of new consumer’s connection to the network:
Recepient Bank: JSC “TBC Bank”
Account Number: GE32TB7015336030100006
Description: Cost for the new nonregulated consumer’s connection to the network (name of the applicant and real address of the object should be indicated)

Filled in application form of the new non-regulated consumer’s connection to the network can be sent to the following e-mail: newcustomers@energo-pro.ge




Application form Download here:

Non-regulated new connection