How to become a customer?

According to company standards, customer must submit filled in application form and if necessary, attach to the form copies of certificates of house ownership and ID card.

How to change data of an old customer with the data of a new one? (name/title of the customer)

To undertake the procedure the owner of the property, who wants to change the name/title has to submit to the company the certificate of ownership of the property (public registry), copy of ID and written application with corresponding request.

How to become a consumer of 0.380 kV voltage?

Transfer from 0.220 kV voltage to 0.380 kV voltage by the customer existing up to 10 kW

If 0,220 kV voltage residential customer owns 0.380 kV voltage electrical device that was connected to the distribution network, herewith total connecting capacity of customers does not exceed 10 kV, customer is authorized to request arrangement of 0.380 kV voltage metering knot instead of 0.220 kV voltage metering knot in the following way:

a) Customer should address to the distribution licensee upon the application and provide arrangement of 0.380 kV voltage metering knot himself/herself. In this case, distribution licensee is obliged to transfer technical specificcation for free within 2 weeks period from receipt.

b) Through distribution licensee, in case of arrangement of 0.380 kV voltage metering knot, distribution licensee is liable to provide replacement of metering knot. And customer is obliged to reimburse expenses spent for replacement-arrangement/assembly of metering knot that does not exceed GEL 250 including VAT.

Considering the above-mentioned conditions/terms the customer should address to the company with the corresponding request.

Bank requisites on which the payent for voltage change fee is to be carried out:

Name of recipient bank: JSC «TBC Bank»
Account Number: GE32TB7015336030100006
Destination: Cost of voltage change (indicated the name of the applicant and actual address of teh object)
Filled in application can be sent on the following e-mail address: newcustomers@energo-pro.ge

How is separation of customer carried out?


If the immovable property owned by the consumer that was being supplied with electricity was divided or was developed the multi dwelling unit, the Rule for connection of new customer is spread on connection of separated immovable property/ multi dwelling unit, corresponding fee and procedures, despite of capacity volume by which the initial property was connected to the distribution network.

During separation of immovable property connected with capacity from 0 up to 10 kw, the owner of separated property pays the fee of new consumer’s connection to the distribution network foreseen by Annex №4 of “Electricity (Capacity) Supply and Consumption Rules” approved by Resolution #20 of September 18, 2008 of “Georgian National Energy And Water Supply Regulatory Commission” if:

Connection of separated immovable property is carried out from 0 up to 10 kw capacity at the voltage step different from initial property;

Connection of separated immovable property is carried out on capacity more than 10 kw;

More than one immovable property was separated from the immovable property connected initially to distribution network;

During separation of immovable property connected with capacity from 0 up to 10 kw, the owner of separated property pays the fee for arranging of metering knot foreseen by Annex №6 of “Electricity (Capacity) Supply and Consumption Rules” approved by Resolution #20 of September 18, 2008 of “Georgian National Energy And Water Supply Regulatory Commission” if:

Only one immovable property was separated from the immovable property connected initially to distribution network and connection of separated immovable property is carried out on capacity from 0 up to 10 kw, on the same voltage stage (0,220 kv or 0,380 kv) on which the initial property was connected.

During separation of immovable property connected with capacity more than 10 kw capacity to be connected, the owner of separated property pays the fee of new consumer’s connection to the network foreseen by Annex №4 of “Electricity (Capacity) Supply and Consumption Rules” approved by Resolution #20 of September 18, 2008 of “Georgian National Energy And Water Supply Regulatory Commission” if:

Connection of separated immovable property on voltage step different from initial property;
Owners of old and separated property can not agree on separation of capacity;
For connection of separated immovable property the existing capacity is not enough for supply of old and separated property with not less than 10 kw capacity;

During separation of immovable property connected with capacity more than 10 kw, the owner of separated property pays the fee for arranging of metering knot foreseen by Annex №6 of “Electricity (Capacity) Supply and Consumption Rules” approved by Resolution #20 of September 18, 2008 of “Georgian National Energy And Water Supply Regulatory Commission” if:

For connection of separated immovable property the existing capacity is enough for supply of old and separated property with not less than 10 kw capacity, parties agree on division of capacity and connection of separated property is carried out on the same voltage stage (0,220 kv, 0,380 kv, or 6/10 kv) on that was connected the initial property.

Application for Separation of Customer

Bank Requisits on which should be carried out payment of the customer separation fee:

Name of recipient bank: JSC “TBC Bank”
Account number: GE32TB7015336030100006
Destination: New consumer’s customer separation fee (indicate name of the applicant and actual address of the object)
Filled in application can be sent on the following e-mail address: newcustomers@energo-pro.ge

How to increase the capacity?

Increase of Capacity to be Connected to the Distribution Network by the Consumer

1. In case of capacity growth by existing consumer the customer is obliged to inform the company in advance with the statement.

2. If 0,4 kv. (380/220V.) and 6/10 kV voltage consumer increasea the actual consumption capacity more than capacity to be connected as foreseen by technical specification in such way that will be needed changing of technical specification, in such a case the company will issue new technical specification and in compliance with requests of the new technical specification will arrange power supply system of this consumer (provides with complete technological cycle), herewith the consumer should pay the fee which is calculated in following way:

a) If the increased (or requested) capacity transferes to distribution network in other proposed package of new consumer’s connection, the consumer should pay the package fee corresponding to the new consumer’s connection to the distribution network from which is deducted the fee defined by that proposed package of new consumer’s connection which is in compliance with connection capacity defined by technical specification of consumer’s existing connection;

b) If the increased (or requested) capacity does not exceed the frames of that proposed package of the new consumer’s connection to the distribution network to which corresponds the capacity to be connected as defined by technical specification of the consumer’s existing connection:

b.a) For the supply of requested capacity is needed reconstruction of electrical network and metering knot connecting with this consumer by the distribution licensee or/and purchase, construction and installation of other appliances, the consumer should pay the fee of new consumer’s connection to the distribution network, which is calculated per kW, the fee of corresponding proposed package to be connected divided into maximal packet capacity and multiplied by kWs additionally requested by the consumer;

b.b) Supply of requested capacity by the consumer does not need the reconstruction of electrical network and metering knot connecting with the consumer or/and purchase, construction and installation of other appliances – payment of the fee is not carried out by the consumer (accordingly, the new technical specification of connection is issed by the distribution licensee without payment the fee).

3. The customer will be informed on the amount of increased capacity connection fee by the technical specificatons and the network construction works will be carried out after paying the fee.

4. If the consumer of 35 kv and more voltage will increase the actual consumption capacity of the power by more than capacity to be connected as foreseen by the technical specification so that for the supply of its requested or increased capacity by the actual consumption will be needed reconstruction of electrical network and metering knot connecting with this consumer or/and purchase, construction and installation of other appliances, in such case for the power supply of this consumer is necessary to re-issue the technical specification of connection and satisfaction of the new technical specification of connection by this consumer.

5. Increase of the power consumtion capacity is being confirmed by using of the same method, from which was carried out defining of the consumer’s capacity to be connected while working out of technical specification on connection to the distribution network.

Bank Requisits on which should be carried out payment of the fee for capacity increase:

Name of recipient bank: JSC TBC Bank
Account number: GE32TB7015336030100006
Appointment: Fee of increased capacity connection to the network (indicate name of the applicant and actual address of the object)
Filled in application can be sent on the following e-mail address: newcustomers@energo-pro.ge